2 days and 350k kms of forest service road, two track, single track and make your own track in the Monashees. We were successful in linking a number of areas over some ridges to make a big loop although a 15L tank+ is definitely required. Working on a tour of BC that may or may not ever get published lol. The scale from valley bottom to highland tops is so huge, always blows me away. Didn't really stop for pics so not much to choose from. This was after a 5500' elevation climb that tops out just about at treeline. Always check the cell at the tops lol.